Unpacking the hull unit from its transport box
The hull unit is delivered in a large wooden transport box.
Prerequisites
The shipyard must provide all necessary tools and manpower. The following specific items
are required for this task:
• Carpenter tools
• A crane (or other lifting device) capable of lifting the entire hull unit
Note
The hull unit is heavy. Appropriate lifting equipment (lifting tackle, portable crane or ship’s
crane) is required. Always use appropriate lifting equipment to minimize risk of personnel
injury or equipment damages. Only certified equipment must be used.
Context
The hull unit, transducer and transducer cable must be handled with care.
Note
The transducer is protected with a thick layer of foam to prevent damage during transport
and hull unit installation. This protection must remain attached while the hull unit is being
manoeuvred into the sonar room.
A
Lifting eye on the gantry
B
Support hardware (wooden cradle and support construction)
C
Transducer protection (thick foam)
Summary of Contents for Simrad MF90
Page 1: ...kongsberg com simrad Simrad MF90 INSTALLATION MANUAL...
Page 2: ......
Page 21: ...476671 B 19 Related topics Simrad MF90 page 13 Simrad MF90...
Page 369: ...476671 B 367 Drawing file...
Page 372: ...370 476671 B Simrad MF90 Installation Manual...
Page 375: ...476671 B 373 Drawing file...
Page 378: ...376 476671 B Simrad MF90 Installation Manual...
Page 384: ...382 476671 B Simrad MF90 Installation Manual...
Page 387: ...476671 B 385 Drawing file...
Page 390: ...388 476671 B Simrad MF90 Installation Manual...
Page 393: ...476671 B 391 Drawing file...
Page 398: ...396 476671 B Simrad MF90 Installation Manual...
Page 421: ......
Page 422: ...2022 Kongsberg Maritime ISBN 978 82 8066 240 8...
Page 423: ......
Page 425: ......
Page 426: ...Installation Manual Simrad MF90...