50
GigaVUE-HC3 Hardware Installation Guide
Unpacking the GigaVUE-HC3 Shipment
The GigaVUE-HC3 node is shipped assembled, except for the modules. The extension
board is already installed in the front of the chassis. The control card, fan tray, and two
power supply modules (PSMs) are already installed in the rear of the chassis. Filler
panels occupy the four front module slots and two remaining rear PSM slots.
The shipping package includes the chassis, an accessory kit containing standard
cables and screws, a rack mounting rail kit, and the left and right sides of the optional
cable management assembly.
The modules are shipped in separate boxes.
Use the following procedure to unpack the node:
1.
Inspect the shipping boxes. If any of the cartons were damaged, file a claim with
the carrier who delivered them.
2.
Open the box containing the GigaVUE-HC3 chassis and remove the accessory kit
from the top of the shipment. The accessory kit contains the power cords, console
cable and adapter, and the left and right sides of the optional cable management
assembly.
If you plan on installing the optional cable management assembly, set aside the two
parts.
3.
Open the module boxes and set them aside.
4.
Leave all protective filler panels in place in the chassis.
DO NOT
install the modules
yet. Gigamon recommends rack-mounting the GigaVUE-HC3 chassis without the
modules because of its weight (~88lb).
Figure 3-1: GigaVUE-HC3 with Filler Panels
Summary of Contents for GigaVUE-HC3
Page 1: ...GigaVUE HC3 Hardware Installation Guide GigaVUE OS 5 7 00...
Page 46: ...46 GigaVUE HC3 Hardware Installation Guide...
Page 70: ...70 GigaVUE HC3 Hardware Installation Guide...
Page 112: ...112 GigaVUE HC3 Hardware Installation Guide...
Page 126: ...126 GigaVUE HC3 Hardware Installation Guide...
Page 132: ...132 GigaVUE HC3 Hardware Installation Guide...