SECTION 14
SUSPENSION
Page 38
TD-25M EXTRA
DRESSTA
TRACK FRAME AND PIVOT SHAFT
c. First, slide the ring 1.547.0397 of pivot shaft seal tool (A) on the shaft and then slide the
sleeve 1.547.0358. Press seal (11) with its seal shield (3) onto pivot shaft (5) in such
a way that the tool (A) sleeve thrust face contacted the shaft face, as shown in Fig. 14.42.
Check this position by tool hole. Take off the tool. Once the seal (11) took its position its
distance (C) to the shaft face is to be equal to 488.5
±
0.8 [mm].
4. Coat O-ring (12) with HIPOL 85W/140 oil or equivalent (refer to OPERATOR’S MANUAL) and
insert into seal shield (3) groove.
5. If bushing (9 and 10) were removed, apply LOCTITE Primer T or N on outside surface
of bushings and allow to dry completely. Be sure bore of track frame is clean and dry. Coat
35 [mm] of outer edge of track frame bore and leading edge of bushing with LOCTITE #609.
Press bushings into track frame until each are flush with outside edges of track frame.
NOTE:
Bushings must be pressed in within five minutes after applying Loctite #609.
6. Assemble the track rollers to the track frame. Refer to TRACK ROLLER in this Section.
7. Install the front top idler mounting bracket (22, Fig. 14.1) with the guide mounting face flush
with the post on the track frame (1). Install rear top idler mounting bracket (21).
8. Attach a hoist to the track frame (1) and keeping it horizontal, position it over pivot shaft (5).
9. Install track frame guide plate with same thickness shims were removed,
10. With the track frame in horizontal position secure snap ring (4) with seal shield (14) to the track
frame (1). Torque bolts with washers to 108 [Nm].
11. Install inner wear washer (7) to the track frame. Position shim pack (8) on end of pivot shaft (5)
and secure the retaining plate (6). Remove or add enough shims (8) to align the center line of
the last track roller with the center line of the sprocket, refer to TRACK FRAME ALIGNMENT in
this Section. Install plate (6) and torque bolts to 845 [Nm].
12. Install outer wear washer (7) in track frame (1). Install cover (2) with O-ring (13) and torque
bolts to 845 [Nm].
13. Remove hoist from track frame. Remove blocking from machine and lower machine onto track
chain.
14. Install guide plate to main frame with same thickness shims were removed, refer to TRACK
FRAME GUIDE in this Section. Torque bolts to 1500 [Nm].
15. Install equalizer bar, refer to EQUALIZER BAR in this Section. Remove blocks from equalizer
bar tunnel on each side of machine.
16. Refill the pivot shaft housing as described in the OPERATOR’S MANUAL. Install O-ring (16) in
groove of oil level dipstick (15). Install dipstick (15) to pivot shaft housing.
17. Install front idler assembly, refer to FRONT IDLER in this Section.
18. Whenever a new track frame or guide plates are installed, track frame alignment must be
checked, refer to TRACK FRAME ALIGNMENT in this Section.
19. Install inner and outer sprocket rock deflectors to rear of track frame and track chain, refer to
TRACK CHAIN in SECTION 15.
20. Machines with “TILT” only (connection at RH side), and with “TILT/PITCH” (connection at both
sides). Using flanges (3, Fig. 14.38) and O-rings (2) reconnect hoses (4) to the trunnion (1).
Install trunnion (1) to track frame (1, Fig. 14.41) and torque the bolts to 845 [Nm]. Install
cover (14) and secure it.
21. Install blade with push arm, refer to SECTION 17.
Summary of Contents for TD-25M EXTRA
Page 1: ...SMTD25MEX07 1E SERVICE MANUAL TD 25M EXTRA SERIAL NUMBERS 75001 AND UP DRESSTA ...
Page 2: ......
Page 4: ......
Page 5: ...SECTION 1 INTRODUCTION ...
Page 6: ......
Page 8: ......
Page 25: ...SECTION 5 STEERING ...
Page 26: ......
Page 27: ...STEERING SECTION 5 DRESSTA TD 25M EXTRA CONTENTS GENERAL 1 DESCRIPTION 1 ...
Page 28: ......
Page 30: ......
Page 31: ...SECTION 6 COOLING SYSTEM ...
Page 32: ......
Page 34: ......
Page 49: ...SECTION 7 DRIVE TRAIN ...
Page 50: ......
Page 52: ......
Page 60: ......
Page 62: ......
Page 83: ...SECTION 7B HYDRAULIC TORQUE CONVERTER ...
Page 84: ......
Page 86: ......
Page 115: ...SECTION 7C TRANSMISSION ...
Page 116: ......
Page 208: ......
Page 209: ...SECTION 7E STEERING DRIVE ...
Page 210: ......
Page 212: ......
Page 251: ...SECTION 7F FINAL DRIVE ...
Page 252: ......
Page 254: ......
Page 272: ......
Page 273: ...SECTION 8 ELECTRICAL ...
Page 274: ......
Page 276: ......
Page 283: ...ELECTRICAL SECTION 8 Page 7 DRESSTA TD 25M EXTRA Fig 8 1 Wiring Diagram earlier version ...
Page 284: ......
Page 285: ......
Page 286: ...SECTION 8 Page 10 ELECTRICAL TD 25M EXTRA DRESSTA Fig 8 1A Wiring Diagram later version ...
Page 331: ...SECTION 9 FRAME ...
Page 332: ......
Page 334: ......
Page 336: ...SECTION 9 FRAME Page 2 TD 25M EXTRA DRESSTA GENERAL Fig 9 2 View of Frame ...
Page 339: ...SECTION 10 HYDRAULICS ...
Page 340: ......
Page 342: ......
Page 363: ...SECTION 10A PUMPS ...
Page 364: ......
Page 366: ......
Page 387: ...SECTION 10B VALVES ...
Page 388: ......
Page 390: ......
Page 412: ......
Page 413: ...SECTION 10C CYLINDERS ...
Page 414: ......
Page 416: ......
Page 449: ...SECTION 10E RESERVOIRS AND FILTERS ...
Page 450: ......
Page 452: ......
Page 459: ...SECTION 12 POWER ...
Page 460: ......
Page 462: ......
Page 478: ......
Page 479: ...SECTION 13 SUPERSTRUCTURE ...
Page 480: ......
Page 482: ......
Page 491: ...SECTION 14 SUSPENSION ...
Page 492: ......
Page 542: ......
Page 543: ...SECTION 15 TRACK OR WHEELS ...
Page 544: ......
Page 546: ......
Page 565: ...SECTION 17 MOUNTED EQUIPMENT ...
Page 566: ......
Page 568: ......