b). Remove retaining ring (72) and thrust race (73) that were previously installed. Measure the
D distance as shown in Fig. 7E.20B. Take the measurement in four 90 [
°
] spaced places.
Select a thrust race (73) and one of five retaining rings (72) in a way that their total thickness
shall equal to D dimension.
Check the pinion gear shaft (79) rolling torque with a 1.249.0017 tool equipped with
a 1.264.0024 socket. If the rolling torque ranges between 0.5 to 2 [Nm] do not use a new
retaining ring (72), the assembly is ready.
If the rolling torque ranges between 2 to 3 [Nm], install a retaining ring (72) that has
0.05 [mm] less in thickness that the ring that was used for measurements.
If the rolling torque ranges between 3 to 6 [Nm], install a retaining ring (72) that has
0.05 to 0.1 [mm] less in thickness that the ring that was used for measurements.
All retaining rings (72) are within maximum tolerance range equal to
±
0.05 [mm] and make
possible to get the correct thickness.
Following are examples of thrust race (73) and retaining ring (72) selection and installation:
For D dimension equal to 6.4 [mm] and a torque equal to 1.5 [Nm] install a 3.18 [mm] thrust
race (73) and a 3.22 [mm] retaining ring (72) to get a total thickness equal to 6.4 [mm].
In that case nothing is to be added to a 6.4 [mm] dimension.
For D dimension equal to 6.2 [mm] and a torque equal to 0.5 [Nm] install a 3.18 [mm] thrust
race (73) and a 3.05 [mm] retaining ring (72) to get a total thickness equal to 6.23 [mm]. In
that case 0.03 [mm] was added.
For D dimension equal to 6.3 [mm] and a torque equal to 4.5 [Nm] install a 3.18 [mm] thrust
race (73) and a 3.05 [mm] retaining ring (72) to get a total thickness equal to 6.23 [mm]. In
that case 0.07 [mm] was removed.
c). Apply a force of 25000 [N] to a cone bearing inner ring (75) to get a 0.13 [mm] bearing shift
towards the assy inner side to facilitate selected retaining ring (72) and thrust race (73)
installation. Make use of a 2.5 [T] hydraulic press to get a required force.
d). Place the pinion gear shaft (79) on pinion gear housing (76) and tap pinion gear shaft end
(79) with a 1 [kg] brass hammer to ensure a positive contact of thrust race (73) and retaining
ring (72) installed before a final pinion gear shaft (79) rolling torque measurement. Make use
of a 1.249.0017 tool equipped with a 1.264.0024 socket to measure the rolling torque that for
new bearings should be equal to 1.5
±
1.5 [Nm].
NOTE:
If you install bearings that were used previously, adjust the rolling torque to get a reading
ranging from 0 to 1.5 [Nm].
e). Some cases need a thrust race (73) and retaining ring (72) total thickness in excess
of 6.4 [mm]. If this is a case add spacer (74) to thrust race (73) and select a correct retaining
ring (72) in such a way that their total thickness makes possible to get the correct rolling
torque.
Following are examples that make use of spacer (74) necessary:
For D distance equal to 6.5 [mm] and rolling torque of 2.8 [Nm] place a 0.38 [mm] spacer
(74), a 3.12 [mm] thrust race (73) and 2.95 [mm] retaining ring (72). That results in total
thickness eqal to 6.45 [mm]. In that case 0.05 [mm] was removed.
For D distance equal to 6.7 [mm] and rolling torque of 5.6 [Nm] place a 0.38 [mm] spacer
(74), a 3.12 [mm] thrust race (73) and a 3.1 [mm] retaining ring (72). That results in total
thickness eqal to 6.6 [mm]. In that case 0.1 [mm] was removed.
NOTE: Due to thrust race (73) and retaining ring (72) thickness tolerance pay a particular attention
while selecting these elements to account for their actual thickness.
Summary of Contents for TD-25M EXTRA
Page 1: ...SMTD25MEX07 1E SERVICE MANUAL TD 25M EXTRA SERIAL NUMBERS 75001 AND UP DRESSTA ...
Page 2: ......
Page 4: ......
Page 5: ...SECTION 1 INTRODUCTION ...
Page 6: ......
Page 8: ......
Page 25: ...SECTION 5 STEERING ...
Page 26: ......
Page 27: ...STEERING SECTION 5 DRESSTA TD 25M EXTRA CONTENTS GENERAL 1 DESCRIPTION 1 ...
Page 28: ......
Page 30: ......
Page 31: ...SECTION 6 COOLING SYSTEM ...
Page 32: ......
Page 34: ......
Page 49: ...SECTION 7 DRIVE TRAIN ...
Page 50: ......
Page 52: ......
Page 60: ......
Page 62: ......
Page 83: ...SECTION 7B HYDRAULIC TORQUE CONVERTER ...
Page 84: ......
Page 86: ......
Page 115: ...SECTION 7C TRANSMISSION ...
Page 116: ......
Page 208: ......
Page 209: ...SECTION 7E STEERING DRIVE ...
Page 210: ......
Page 212: ......
Page 251: ...SECTION 7F FINAL DRIVE ...
Page 252: ......
Page 254: ......
Page 272: ......
Page 273: ...SECTION 8 ELECTRICAL ...
Page 274: ......
Page 276: ......
Page 283: ...ELECTRICAL SECTION 8 Page 7 DRESSTA TD 25M EXTRA Fig 8 1 Wiring Diagram earlier version ...
Page 284: ......
Page 285: ......
Page 286: ...SECTION 8 Page 10 ELECTRICAL TD 25M EXTRA DRESSTA Fig 8 1A Wiring Diagram later version ...
Page 331: ...SECTION 9 FRAME ...
Page 332: ......
Page 334: ......
Page 336: ...SECTION 9 FRAME Page 2 TD 25M EXTRA DRESSTA GENERAL Fig 9 2 View of Frame ...
Page 339: ...SECTION 10 HYDRAULICS ...
Page 340: ......
Page 342: ......
Page 363: ...SECTION 10A PUMPS ...
Page 364: ......
Page 366: ......
Page 387: ...SECTION 10B VALVES ...
Page 388: ......
Page 390: ......
Page 412: ......
Page 413: ...SECTION 10C CYLINDERS ...
Page 414: ......
Page 416: ......
Page 449: ...SECTION 10E RESERVOIRS AND FILTERS ...
Page 450: ......
Page 452: ......
Page 459: ...SECTION 12 POWER ...
Page 460: ......
Page 462: ......
Page 478: ......
Page 479: ...SECTION 13 SUPERSTRUCTURE ...
Page 480: ......
Page 482: ......
Page 491: ...SECTION 14 SUSPENSION ...
Page 492: ......
Page 542: ......
Page 543: ...SECTION 15 TRACK OR WHEELS ...
Page 544: ......
Page 546: ......
Page 565: ...SECTION 17 MOUNTED EQUIPMENT ...
Page 566: ......
Page 568: ......