Installation Training 

I-6800-39 

Summary of Contents for FLX

Page 1: ...Installation Training I 6800 39...

Page 2: ...Installing the FLX There are two methods used for shipping the unit assembled and non assembled We will focus on the non assembled method first...

Page 3: ...n assembled Setup 1 With the help of an assistant install the lower plate under the two leg assemblies as shown 2 Attach with mounting hardware four SHCS 1 4 20 x 5 long with1 4 split washers both sid...

Page 4: ...x mounting screws 4 With an assistant lift overhead into place on top of leg assemblies WARNING This scanner requires a two person lift Failure to comply may cause bodily injury Two adults are require...

Page 5: ...he pins on rear of the overhead are seated into the holes on leg assemblies 6 When seated properly overhead locks into place To ensure safety the overhead should still be supported by an assistant unt...

Page 6: ...7 From rear of scanner secure overhead with mounting hardware two SHCS1 4 20 x 5 8 long with 1 4 split washers both sides...

Page 7: ...n 10 Run the tape diagonally to the upper open corner as shown and record the measurement Measurement should be approximately 65 3 8 166cm 11 Take the same measurement on the opposite corners and reco...

Page 8: ...12 From top of scanner secure overhead with mounting hardware two SHCS 1 4 20 x 5 8 long with 1 4 split washers both sides...

Page 9: ...ove the glides 15 Position patient chair on gantry base Ensure base frame centering screw is seated within patient chair centering block 16 Loosely secure patient chair to gantry 4 bolts Do not tighte...

Page 10: ...our long screws from red shipping plate Keep shipping plate attached with remaining hardware Do NOT discard mounting hardware Long screws used for receptor assembly mounting and short screws for sourc...

Page 11: ...gning the mounting pins 21 Attach assembly with four long mounting screws acquired from red shipping plate Once secured remove remaining screws from shipping plate and save for later use Remove shippi...

Page 12: ...red white connector through brackets and connect to other red white connector 24 Feed second gray wire through brackets and connect the red black wires with white connectors 25 Connect together the gr...

Page 13: ...26 Connect grey wire with green connector to assembly Run wire behind motor as shown...

Page 14: ...ng cover outward to remove 28 Feed LEMO connector through hub and plug into panel Rotate red dot on connector to the 3 o clock position Slide connector into receptor until it snaps in place 29 Feed gr...

Page 15: ...r 32 Attach mounting screws 33 Locate X ray source assembly and remove from packing material 34 Place assembly on clean surface Remove and set aside the magnetic mounted X Ray source window panel from...

Page 16: ...36 Detach outer cover ONLY 37 Carefully detach and move inner source cover a few inches away from assembly 38 Remove ribbon cable from beam limiter assembly by pressing connector locking tab...

Page 17: ...39 Using very little force slowly rotate gantry counterclockwise Stop the rotation when you feel that the gantry is at the limit switch position 40 Slide inner source cover onto the gantry overhead...

Page 18: ...emoved from red shipping plate along with four split washers 43 Draw the 3 cables out through the opening Ensure that the cables are not stretched or damaged 44 Record label information that is requir...

Page 19: ...ounting nut and installing lug over the star lock washer Replace mounting nut 46 Attach together black cables with the two connectors 47 Attach grey wire with red white connector as shown Ensure red s...

Page 20: ...er assembly 49 Slide inner source cover into place onto top mounting notches 50 Mount outer cover onto mounting notches over panel cover 51 Attach covers with hex mounting screws at top and bottom qua...

Page 21: ...pproximately 66 5 to 68 inches 169 to 173 cm from the floor to the center of the mounting bar 54 Use 3 wall anchors screws to mount the bar securely to the wall The type and length of mounting hardwar...

Page 22: ...1518 Control Box connector on rear of overhead panel Connectors are keyed to prevent improper insertion For wall mounting options see Wall Mount Control Box chapter 58 Connect shorting plug to 1525 do...

Page 23: ...atient chair connector Connectors are keyed to prevent improper insertion Rotate red emergency stop button to verify that it is disengaged 62 Connect power cable to AC POWER IN connector on rear of ov...

Page 24: ...64 Connect power cable to hospital grade receptacle 65 To ensure that the device cabling does not interfere with the rotation of the gantry use Cable Clips to dress cabling as shown...

Page 25: ...adapter 4 Set power switch at rear of scanner controller to 1 on This does NOT power on the device Peripheral devices will be powered on later in the workflow CAUTION To assure proper Ethernet communi...

Page 26: ......

Page 27: ...Level Gantry To achieve optimal performance it is imperative that the gantry be properly leveled 1 Scanner must be leveled from side to side and front to back...

Page 28: ...el overhead gear by manually adjusting the front gantry feet 3 Adjust the rear gantry feet using the 1 2 open ended wrench NOTE Ensure levelness of overhead gear is measured front to back and side to...

Page 29: ...4 Store red shipping bracket in overhead 5 Replace shielding cover...

Page 30: ...6 Replace top cover 6 screws 7 Now that the scanner is positioned and leveled tighten wall bracket at top rear of gantry 8 Switch the power circuit breaker located on the overhead rear panel to l on...

Page 31: ...er power button in front and touch screen power button on right side NOTE If at any time the Ethernet cable connecting the scanner to the scanner controller becomes disconnected reconnect the cable an...

Page 32: ...Physical Installation Complete...