R5905948 /12
Event Master Devices
396
5.
Install the six screws, but leave them loose.
6.
Install the standoff through the front plate of the bracket.
7.
Install the BNC washers and nuts.
8.
Tighten the standoff to 5 in-lbs.
9.
Tighten the BNC nuts to 12 in-lbs.
10.
Tighten the six screws to 5 in-lbs.
11.
Install the zip-tie mount and the zip tie.
12.
Secure the fan cable with the zip tie.
14.7 Front Cover Assembly
Flow chart
Image 14-17
Overview
Image 14-18
1
Front Cover Assembly
2
Front Brackets
3
EMI Filter
4
1RU Fan Tray
5
3RU Fan Tray
6
VPU Cards
The EMI filter is no longer needed, and it can be removed. If the EMI filter is left in place, it requires
servicing. See
”
Necessary tools
1 x Screwdriver HEX 0.05" 7.05" (Provide by Barco in the original package).
Summary of Contents for Event Master E2 Series
Page 1: ...ENABLING BRIGHT OUTCOMES User s Guide Event Master Devices...
Page 12: ...R5905948 12 Event Master Devices 12...
Page 24: ...R5905948 12 Event Master Devices 24 Safety...
Page 52: ...R5905948 12 Event Master Devices 52 General...
Page 82: ...R5905948 12 Event Master Devices 82 Hardware orientation...
Page 102: ...R5905948 12 Event Master Devices 102 Front Panel Menu orientation...
Page 272: ...R5905948 12 Event Master Devices 272 Image 6 137 EM GUI orientation...
Page 304: ...R5905948 12 Event Master Devices 304 Updating firmware...
Page 326: ...R5905948 12 Event Master Devices 326 Image 9 28 General operation example...
Page 382: ...R5905948 12 Event Master Devices 382 Preventive maintenance actions...
Page 444: ...R5905948 12 Event Master Devices 444 E2 Maintenance...
Page 528: ...R5905948 12 Event Master Devices 528 EC 200 EC 210 Maintenance...
Page 569: ...569 R5905948 12 Event Master Devices Troubleshooting C...
Page 572: ...R5905948 12 Event Master Devices 572 Troubleshooting...