2-10 Thermo
Electron
January
2004
PD-Z007E/ST
Flowcell
Retaining Block
Retaining Block
Knob
Retaining Bolt
Figure 2.5 Flowcell installation
3.
Use the supplied fingertight fittings and tubing sets included
with the flowcell kit to connect the HPLC column outlet
directly to the detectors’ flowcell (fluid) inlet. The outlet of the
flowcell is on the same side as the locating notch on the top of
the flowcell. The flowcell inlet is on the opposite end.
NOTE: The inlet tube is .005
″
I.D. and colored red with an external
Teflon sheath. The outlet tube for the flowcell is .010
″
I.D. and colored
blue.
4.
Place the detector's outlet line in the waste reservoir. When
using an optional backpressure regulator (P/N 802259),
connect the oulet line to the low-pressure union and waste
tubing.
HINT: If you have several detectors (fluorescence, refractive index,
electrochemical, etc.) hooked up in series, place your UV6000LP
detector closest to the column outlet, as its flowcell can withstand the
greatest back-pressure. A back pressure regulator is often recommended
to prevent bubble formation in the detector flow cell.
Содержание Finnigan SpectraSYSTEM UV6000LP
Страница 1: ...Finnigan SpectraSYSTEM UV6000LP Detector Reference Manual A0099 595 Revision F ...
Страница 8: ......
Страница 12: ......
Страница 16: ......
Страница 44: ......
Страница 76: ......
Страница 91: ...January 2004 Thermo Electron 5 15 Figure 5 8 Holmium oxide absorbance spectrum ...
Страница 118: ......
Страница 129: ...January 2004 Thermo Electron 8 11 PD Z115E Figure 8 6 Power button and bracket removal ...
Страница 134: ......