Guidance
37
3 E
therC
STEP 1
Check the installation and connection.
Connect to CN1
Connect to CN1
Control power supply *2
Circuit breaker *3
Circuit breaker *3
Main power supply
Connect to CN3
EtherCAT cable
Driver
Motor
Master
Connect to CN2
Connection cable *1
Required
*1 It is an Oriental motor cable. Purchase is required separately.
*2 Connecting the control power supply allows you to continue monitoring even if the main power supply is shut off.
Connect it as necessary.
*3 It is recommended that a circuit breaker or a circuit protector is connected because incorrect wiring may cause the
internal input circuit to short-circuit.
STEP 2
Make preparations for operation.
Refer to “Before starting operation” in the
AZ
Series OPERATING MANUAL Function Edition.
STEP 3
Set a node address.
Set a node address using the node address setting switch (ECAT ID ×1) on the driver.
1. Set the node address setting switch as shown below.
Setting: 1 (
×
1: 1)
ECAT ID ×1
2. Turn on the main power supply and the control power supply again.
Be sure to turn off the main power supply and control power supply of the driver before setting the
switch. Setting the switch while the main power supply and the control power supply are in an on-state
will not enable the new setting.
STEP 4
Operate the motor
Put the motor into an excitation state via EtherCAT communication to input the operation command.
Содержание aSTEP AZ mini Driver
Страница 14: ...14 1 Introduction...
Страница 128: ...128 3 EtherCAT communication...
Страница 146: ...146 4 Object list...
Страница 164: ...164 5 Troubleshooting...
Страница 170: ...170 6 Reference materials...
Страница 171: ...171 6 Reference materials...