
19. Appendix J
19.1. Load Interactions for Fieldbus Related Operations
558
Experion PKS Series A Fieldbus Interface Module User's Guide
R400
Honeywell
July
2010
Operation
Build Link
Schedules
Load
Schedule
into FIM's
Link
Load LM
Schedules
into
LM-Capable
Devices
Load
Used
Function
Blocks
State Required
for Operation
Load CM (from
Project)
Yes Yes
All LM-
capable
Yes
Blocks in CM =
OOS
CM = Inactive,
Link = Active,
Device = N/A
Load CM (from
Monitor)
No No
No Yes
Blocks in CM =
OOS
CM=Inactive,
Link=Active,
Device=N/A
Delete CM from
Loaded
Yes Yes
All LM-
capable
No
Blocks in CM =
OOS
CM=Inactive,
Link=Active,
Device=N/A
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...