
7. Fieldbus Device Commissioning
7.4. Checking Control Strategy
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
283
July 2010
Honeywell
Stage Funtion Completed
Making a fieldbus device type from vendor DD
25
Match device.
If you are running software version R210 or greater, a wizard is
provided to guide you through the steps for matching an
uncomisisioned device.
References:
Matching uncommissioned device to project device or vice versa
26
Load (Partial Load) the new device from Project tab.
References:
Loading Link contents or fieldbus device
27
Measure and compare H1 segment baseline with Fluke
Scopemeter and Relcom FTB-3 or equivalent equipment.
28
Are measurements within specifications?
NO
> Go to Stage
29
YES
> Go to Stage
30
29
Identify source of noise or communication problems and repair or
replace equipment as required.
Return to Stage 27
30
Do you need to add more devices on this segment?
NO
> Go to Stage
31
in the next section
Checking Control
Strategy
.
YES
> Return to Stage
8
in previous section
Connecting
Devices.
7.4 Checking Control Strategy
Stage Funtion Completed
31
Is control strategy configured?
NO
> Go to Stage
32
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...