
5. Configuration
5.5. Loading Components Online
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
223
July 2010
Honeywell
Step Action
Result
TIP
If errors are detected, they will be listed and you will be prompted to select whether or
not you want to continue the load with errors. It is a good idea to note the errors and
abort the load (close), so you can go back and correct the errors before completing the
load. The following illustration is for example purposes only and the errors listed are
not
typical.
If the load generates errors identifying
subschedule
problems, you must
reconfigure the Link Master capable device to become a
Basic
one through
Control Builder, and restart the device to initiate the change. Otherwise, if the
FIM fails, the potential for a "no schedule" condition exists. Since the
schedule is cleared from the Link Master capable device upon the detection
of subschedule load errors, it can
not
function as the backup LAS without a
schedule.
Please see the
Checking/changing fieldbus device functional class section for details on
reconfiguring a device as a
Basic
type.
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...