
8. Maintenance, Checkout, and Calibration
8.1. Adding, Removing and Replacing Components
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
301
July 2010
Honeywell
Step Action
Result
6
Click the Close button to acknowledge
any errors or skip this Step, if no errors
are detected.
Deletes CM (pidloop) from CEE folder
along with fieldbus block (FFAI101) from
device (ST101) in Monitoring tab, for this
example.
7
Repeat Steps 4 to 6 for other CMs, as
required.
TIP
It is a good idea to record the Tag and Address assignments for the failed device
before deleting it.
8
Right-click the failed device icon and
select Force Delete from the popup
menu.
Opens Force Delete dialog.
9
Click the Delete Selected object(s)
button.
Deletes Failed device from the Link folder
in Monitoring.
10
In Project tab, double-click the CM
(pidloop) that was deleted from the
Monitoring tab.
Opens CM in control chart.
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...