R400
Experion PKS Series A Fieldbus Interface Module User's Guide
557
July 2010
Honeywell
19. Appendix J
19.1 Load Interactions for Fieldbus Related Operations
Summary
The following table provides a matrix of load interactions for given fieldbus related
operations.
ATTENTION
If you make on-line changes to parameter values in fieldbus devices, the
changed values are not written to the Monitoring or Project copy of the control
strategy. You must initiate an "Upload" function to write
the new values to
Monitoring followed by an "Update to Project" function to write the
Monitoring values to the Project copy.
Operation
Build Link
Schedules
Load
Schedule
into FIM's
Link
Load LM
Schedules
into
LM-Capable
Devices
Load
Used
Function
Blocks
State Required
for Operation
Load Device
or
Replace Device
No No
This device
only, if LM-
capable
Yes
Blocks in device
= OOS,
Device = OOS,
Link = Active
Delete Device
from Loaded
No No
No No
Blocks in device
= OOS,
Device = OOS,
Link=Active
Load Link with
Contents
Yes Yes
All LM-
capable
Yes
Blocks in related
CMs = OOS,
Device = OOS,
Link = N/A
Load Link
(without
contents)
No
Yes
No
No
Link = N/A
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...