
5. Configuration
5.5. Loading Components Online
204
Experion PKS Series A Fieldbus Interface Module User's Guide
R400
Honeywell
July
2010
About Load Dialog box
The following figure shows a sample Load Dialog box invoked for a load with contents
operation for a CIOM-A FIM. It provides a brief description of the dialog box features
for quick reference.
The load operation is still an offline function. The Load Dialog box
provides the ability to automatically inactivate a component during a
load and then return the component to its active state. Do
not
use
this automatic inactivate/activate function, if your process can
not
tolerate the load disruption and consequent delay in activation. In
this case, you must manually toggle the component state through
the Monitoring tab in Control Builder.
Lists components
to be loaded
Chance to
select partial
load, if
applicable
Shows
current
state of
component
Specifies state
component
must be in
during load
Specifies state
component will
assume after
load is completed
Can select
another state
from dropdown
menu for this
field
Individual checkboxes
let you edit list of
components to be
loaded
Shaded area flags
components in
Active State
Select whether or
not component is
to be automatically
put into Inactive/
Out-Of-Service state
for the load
Select whether or not component is
to be automatically put into selected
Post Load State after the load
Components in
Active state are
flagged
Figure 26 Load Dialog box provides more load choices.
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...