
8. Maintenance, Checkout, and Calibration
8.1. Adding, Removing and Replacing Components
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
297
July 2010
Honeywell
Step Action
Result
10
Click the checkboxes for the automatic
state changes near the bottom of the
dialog box. Click the OK button.
Load dialog appears to track progress of
the load.
11
Once the load is completed, check the
Monitoring tab to confirm that the device
icon has turned green and function
blocks are inactive (blue) or active
(green) per the selected Post Load State.
Return to normal operation.
12
This completes the device replacement procedure.
Replacing a failed device with a different device using a different block type
Use the following procedure to replace a failed device with a different device using a
different block type. This procedure assumes the system is offline or in a safe operating
mode. The illustrations used are for example purposes only and may differ from the
actual forms that appear in your system
ATTENTION
Starting with R400, you can generate an Unlike Device Replacement Report
for an FF device. You can view the device-related information and the control
Modules that would be affected by Unlike Device Replacement.
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...