
Contents
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
xiii
July 2010
Honeywell
Using Station Event Summary display ...............................................................................252
6.3
Monitoring Fieldbus Functions Through Monitoring Tab....................... 253
Inactivating/Activating a Link ..............................................................................................253
Monitoring/Interacting with given component/block ............................................................256
Checking/changing fieldbus device functional class...........................................................257
Checking live list and interacting with uncommissioned devices........................................264
Viewing and optimizing Link schedule configuration ..........................................................267
CheckingCIOM-A FIM redundancy status and initiating manual switchover ......................273
Using Controller menu functions ........................................................................................275
7.
FIELDBUS DEVICE COMMISSIONING.....................................277
7.1
Getting Started ............................................................................................ 277
Read this first .....................................................................................................................277
Initial checks and operations ..............................................................................................279
7.2
Connecting Devices .................................................................................... 280
7.3
Checking Device.......................................................................................... 282
7.4
Checking Control Strategy......................................................................... 283
7.5
Flowchart Summary.................................................................................... 284
8.
MAINTENANCE, CHECKOUT, AND CALIBRATION................287
8.1
Adding, Removing and Replacing Components...................................... 287
About removal and insertion under power (RIUP)..............................................................287
General procedure .............................................................................................................287
Guidelines for adding fieldbus device to "live"/operating Link ............................................288
Using optional safe handling of new devices......................................................................289
Replacing a failed device with a like device having the same model name and device revision
...........................................................................................................................................290
Replacing a failed device with a different device using a different block type ....................297
8.2
Unlike Device Replacement Report........................................................... 317
8.3
Replacing Device Template with a Different One .................................... 320
Prerequisites ......................................................................................................................320
Considerations ...................................................................................................................321
Using Unlike Template Replacement wizard to make device replacements ......................321
8.4
Correcting Some Common UTR errors..................................................... 328
8.5
Upgrading Firmware in Uncommissioned Device ................................... 328
8.6
Changing or Clearing Tag and/or Address of Uncommissioned Device332
8.7
Using Fieldbus Device Simulate Function ............................................... 334
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...