
6. Operation
6.3. Monitoring Fieldbus Functions Through Monitoring Tab
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
261
July 2010
Honeywell
Step Action
Result
3
Press <Tab> twice.
Moves cursor to the Boot Operational
Function Class
TIP
The FIM is the primary Link Master for both Links. If you designate a device as a
"backup" Link Master, be sure it has the capacity to handle the Link Schedule.
Otherwise, you may have to reset the device as a Basic type and restart it to restore
operation, if the Link Schedule is too large for it to handle.
4
If applicable, click
button in the field
and select BASIC from the dropdown
menu.
Initiates online change value prompt.
5
Click the Yes button to acknowledge the
change.
Functional boot class changes to BASIC.
6
Click the OK button to close the
Parameters form.
Return to Control Builder application.
7
Double-click the Resource block icon
.
Calls up Resource Block Parameters
form.
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...