
5. Configuration
5.4. Configuring Fieldbus Components In a Control Strategy
184
Experion PKS Series A Fieldbus Interface Module User's Guide
R400
Honeywell
July
2010
Step Action
Result
2
Key in >AI_LEVEL<. Press <Tab>.
Moves cursor to the Description field.
3
Key in >Input for Tank 106 Level<. Press
<Tab>.
Moves cursor to the Execution Order in
CM field and highlights it.
ATTENTION
The Execution Order in CM parameter defines the order of execution and publication
for all blocks contained in the CM. For contained fieldbus blocks, this parameter
combines with the CM's Execution Order in Link parameter to determine how the
fieldbus block participates in the Link Schedule.
TIP
You can use the Pre-execution delay (PREXEGAP) and the Post execution delay
(POSTEXEGAP) parameters to add extra time before and after the execution of the
block. This lets you adjust the schedule to achieve such actions as forcing multiple AI
blocks to execute at the same time (even though they must publish serially).
4
Accept the default value 10. Press <Tab>
three times.
(The smaller the number the sooner the
block executes within the CM cycle.)
Moves cursor to Tag Description field
and highlights it.
5
Key in desired Block Tag Description
consisting of up to 32 characters. Press
<Tab>.
Moves cursor to Mode/Normal selection.
6
Accept default selection - AUTO. Press
<Tab>.
Moves cursor to the Grant/Program
selection.
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...