
7. Fieldbus Device Commissioning
7.2. Connecting Devices
280
Experion PKS Series A Fieldbus Interface Module User's Guide
R400
Honeywell
July
2010
Stage Funtion Completed
Adding CIOM-A FIM block
to Project
Loading a CIOM-A FIM and its Links
3
Was FIM download successful?
NO
> Go to Stage
4
YES
> Go to Stage
7
4
Is chassis and CIOM-A FIM powered?
NO
> Go to Stage
5
YES
> Go to Stage
6
5
Be sure required voltage is present at the power supply and it is
turned On.
Replace power supply, if required.
Return to Stage 2.
6
Verify network connections.
Replace FIM, if required.
Return to Stage 2.
7
Measure and establish H1 segment baseline with Fluke
Scopemeter and Relcom FTB-3 or equivalent equipment.
Go to Stage
8
in the next section
Connecting Devices
7.2 Connecting
Devices
Stage Funtion Completed
8
Connect the next device.
References:
Wiring
9
Does device appear on link?
NO
> Go to Stage
10
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...