
8. Maintenance, Checkout, and Calibration
8.1. Adding, Removing and Replacing Components
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
315
July 2010
Honeywell
Step Action
Result
41
Wait for load to complete and check that
UCD changes to commissioned device,
in Monitoring tab.
42
In Project tab, click CEE with
reconfigured CM and click Controller-
>Load With Contents.
Calls up Load Dialog.
Содержание Experion PKS Series A
Страница 241: ...5 Configuration 5 9 Summary R400 Experion PKS Series A Fieldbus Interface Module User s Guide 241 July 2010 Honeywell ...
Страница 242: ......
Страница 559: ......
Страница 560: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...