GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
4 - 32
Section 4-11 - Keyboard Function Checks
4-11-2
OP Panel Encoder Assy Validation
1.) Follow up the procedure 8-4-1 to run the scfpapitest program.
2.) Check the each Encoder in Table 4-25 on page 29.
4-11-3
OP Panel TGC assay Validation
1.) Follow up the procedure section 4-11-1 on page 28 to run the scfpapitest program.
2.) Slide TGC pot and check up the value.
4-11-4
TGC Knob Set validation
1.) Follow up the procedure section 4-11-1 on page 28 to run the scfpapitest program.
2.) Slide TGC pot and check up the value.
4-11-5
A/N Key assy validation
1.) Boot up the system
2.) Press 'Comment' button
3.) Press A/N keyboard.
4-11-6
Trackball Assy validation
1.) Boot up the system
2.) Press the measurement button.
3.) Move the Trackball
4-11-7
OP Panel HUB Board Assy Validation
1.) 4-11-1 - Main Keyboard Assy validation process.
2.) 4-11-5 - A/N Key assy validation validation process.
3.) 4-11-6 - Trackball Assy validation process.
NOTICE
While rotating or pressing encoders, Encoder message should be displayed in Log of Scfpapitest.exe
NOTICE
While sliding TGC pot, TGC message should be displayed.
NOTICE
While sliding TGC pot, TGC message should be displayed.
NOTICE
Each key should be displayed on the monitor display.
NOTICE
When you move the trackball in measurement mode, the cursor should be moved.
NOTICE
Main keyboard, A/N Keyboard and Trackball should be working.
Содержание LOGIQ 5 PRO
Страница 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Страница 3: ......
Страница 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Страница 50: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL 2 12 Section 2 3 Facility Needs ...
Страница 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...