background image

ÄKTAprocess

Site Preparation Guide

Содержание AKTAprocess

Страница 1: ...KTAprocess Site Preparation Guide...

Страница 2: ...Table of Contents 3 1 Introduction 5 2 Site preparation overview 13 3 Site preparation checklist 2 KTAprocess Site Preparation Guide 29 1396 55 AA Table of Contents...

Страница 3: ...ck to GE Make sure to read the entire Site Preparation Guide and complete the Site preparation checklist in Chapter 3 Return the completed Site preparation checklist to the GE service office in your r...

Страница 4: ...personnel Primary users Review the safety information Make sure that all customer provided materials for the installation are present at the site Facilities personnel Make sure that the installation...

Страница 5: ...onal code of practice for biosafety General site requirements The following requirements must be fulfilled at the location where the KTAprocess system will be installed KTAprocess is intended for indo...

Страница 6: ...1 m of free space around the system to allow service and mainte nance 2050 x 3200 mm Minimum floor area for operating the KTAprocess 1 SS and PP system Cabinet 30 including 1 m of free space around t...

Страница 7: ...W x H x D illustration KTAprocess 1 SS and PP Cabinet 30 1050 x 1890 X 2200 mm W x H x D not shown The weight of the KTAprocess system is KTAprocess 6 mm 10 mm 3 8 and 1 2 Cabinet 10 Approximately 40...

Страница 8: ...with the following dimensions Dimensions mm Contents 2070 x 1730 x 1110 mm W x H x D KTAprocess 6 mm 10 mm 3 8 and 1 2 system Cabinet 10 2680 x 1930 x 1310 mm W x H x D KTAprocess 1 SS and PP system...

Страница 9: ...he following ways A fixed power supply by means of a permanent connection with a safety switch UL or CE classified systems A connector compliant with IEC 60309 2 CE classified systems only GE does not...

Страница 10: ...unpacking the system 13 mm wrench or ratchet wrench with 13 mm socket Used for unpacking the system Electrical TX25 screwdriver or powerdriverwitha hexalobu lar TX25 bit Used for unpacking the system...

Страница 11: ...2 meters each of the correct in ternal diameter TC connections Flexible hoses System documentation is delivered with the system and is required during installation Reference Manuals System Binder I II...

Страница 12: ...relevant certificates Note Gas supply The following table lists the air supply requirements Specification Gas 5 5 to 7 bar Compressed air pressure Airflow minimum 50 Nl min during normal operation Com...

Страница 13: ...uirement General When was the KTAprocess system received month year Will the GE service personnel be required to take site EHS Environment Health and Safety or secu rity training before doing the inst...

Страница 14: ...uipment PPE as required e g gloves lab coats etc 13 mm wrench or ratchet wrench with 13 mm socket Electrical TX25 screwdriver or power driver with a hexalobular TX25 bit Safety knife Buffer and waste...

Страница 15: ...illed as specified pressure and supply Additional information Customer contact information Date dd mmm yyyy Company Customer name Company Customer representative Name Address Email Phone number Advanc...

Страница 16: ...copy of these terms and conditions is available on request Contact your local GE Healthcare repre sentative for the most current information GE Healthcare Europe GmbH Munzinger Strasse 5 D 79111 Freib...

Отзывы: