GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
Chapter 8 Replacement Procedures
8 - 55
7.) Unscrew five screws (3-7) and remove OP Side L Cover. Refer to Figure 8-53.
NOTE:
Different screw in length is used in the location Number (7).
8.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-5-8-5
Mounting procedure
Install the new parts in the reverse order of removal.
Figure 8-53 Unscrew 5 screws to remove OP L Cover
Table 8-27 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
2380207
, Rev 7+, Section 8-5-8. Equipment
passed all required tests and is ready for use. “
Cover Parts Function Validation
(3)
(4)
(5)
(6)
(7)
Содержание LOGIQ 5 PRO
Страница 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Страница 3: ......
Страница 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Страница 50: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL 2 12 Section 2 3 Facility Needs ...
Страница 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...