GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
3 - 14
Section 3-5 - Completing the Installation
3-5-2
Power Off/ Shutdown
NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may
not be able to boot if power is recycled too quickly.
3-5-2-1
Power Shutdown
1.) Press once the
ON/OFF
key at the front of the System.
2.) Click the shutdown button in the Exit dialog box as Figure 3-17 on page 3-14
3.) Switch OFF the Main Circuit Breaker at the rear of the system Refer to Figure 3-13 on page 3-11 .
4.) Disconnect the Main Power Cable is necessary.
For example : Relocating the scanner.
Figure 3-17 System Exit Window
NOTICE
Disconnecting the Mains Power Cable
before
switching OFF the Circuit Breaker will activate the
uninterruptible power system (UPS) in the backend processor, forcing an ordered shutdown of the
system.
NOTICE
The UPS serves
only
as a battery backup that allows for a soft shut-down of the scanner to prevent file
corruption.
IT DOES NOT REGULATE INCOMING VOLTAGE
.
Содержание LOGIQ 5 PRO
Страница 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Страница 3: ......
Страница 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Страница 50: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL 2 12 Section 2 3 Facility Needs ...
Страница 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...