ELECTRICAL COMPONENTS: FE400, KEY-START ENGINE
Starter/Generator (Model 114-01-4005)
2006-2010 Turf/Carryall 272/472 and XRT 1200/1200 SE Maintenance and Service Manual
Page 12-19
12
2. Press a new ball bearing (35) onto the output end of the armature
. Press a
new ball bearing onto the commutator end of the armature shaft.
See following CAUTION.
ý
CAUTION
• To prevent damage to the retainer, use care while pressing new bearing onto the output end of
the shaft.
• Press against the inner race of the new bearing until it is fully seated.
3. Install the drive end cover (36) onto the armature. Secure the bearing retainer ring (32)
.
4. Slide the housing with field coils over the armature. Use the tapped mounting holes to align housing to
the cover, rotate and orient as shown.
NOTE:
The terminal insulators should be on the commutator end of the housing.
5. To prevent contact between the brushes and commutator as the commutator cover is installed, and pos-
sible damage to the brushes, lift the brush springs out of the notches in the brushes and pull the brushes
back from the center of the commutator end cover. The springs will rest on the sides of the brushes and
help prevent them from sliding towards the center of the cover
6. Install the commutator end cover (23) onto the armature shaft. Use the tapped mounting holes to align
housing to the cover, rotate and orient as shown. Install the two M6 x 180 mm bolts (20), and tighten to
60 in-lb (6.8 N·m)
7. Push the brushes down into the holders. Place springs into the notches in the brushes. Install the brush
cover (30) that has the drain hole in it next to the A2 terminal. Install the remaining three brush covers
(29) in the openings in the commutator end cover (23)
.
8. Install the belt pulley (39) onto the shaft, and install the lock washer (40) and M14 nut (41). Tighten the
.
Starter/Generator Installation
1. Install the green wire from the F1 terminal to the A1 terminal on the starter/generator
. Install a flat washer, lock washer, and nut onto each terminal and tighten to 48 in-lb (5.4
N·m).
2. Install two 3/8-inch hex-head pivot bolts (5) into the mounting bracket with the heads of the bolts facing
toward the driver-side of the vehicle. Position the starter/generator in the mounting bracket so that the
bolts will go through the starter/generator before going through the bracket. Install a lock nut (7) onto
each bolt. Tighten to finger tight
.
3. Install the adjustment bolt (11) through the adjusting bracket (4) and then through the starter/generator.
Install a lock washer (9) and 5/16-inch nut (12) onto the end of the adjustment bolt (11). Tighten to finger
tight.
4. Install the belt (3), then tighten the mounting bolts.
See Belt Tension Adjustment on page 12-20.
5. Connect the yellow wire from the voltage regulator to the DF terminal on the starter/generator. Install a
flat washer, lock washer, and nut onto the terminal. Tighten the nut to 18 in-lb (2.0 N·m).
6. Install the white wire from the solenoid to the F2 terminal on the starter/generator. Install the black wire
from the frame to the A2 terminal on the starter/generator. Install a flat washer, lock washer and nut onto
each terminal, and tighten the nut to 45 in-lb (5.1 N·m). Bundle and tie wrap excess wire.
Содержание CARRYALL 272
Страница 2: ......
Страница 14: ......
Страница 18: ...1...
Страница 52: ...5...
Страница 90: ...6...
Страница 110: ...7...
Страница 112: ...8...
Страница 128: ...10...
Страница 170: ...11...
Страница 224: ...13...
Страница 284: ...16...
Страница 302: ...17...
Страница 308: ......
Страница 309: ...Club Car R NOTES...
Страница 310: ...Club Car R NOTES...
Страница 311: ......