2 - 22
SPEC
CABLE ROUTING DIAGRAM
È
Fasten the “ENGINE STOP”
button lead and sub wire har-
ness to the frame at the pro-
tecting tube for the “ENGINE
STOP” button lead with a plas-
tic locking tie and cut off the tie
end.
Ô
Fasten the sub wire harness
and hot starter cable to the
frame at the white tape for the
sub wire harness with a plastic
locking tie and cut off the tie
end.
Fasten the sub wire harness to
the frame with a plastic locking
tie and cut off the tie end.
Ò
Pass the sub wire harness
between the engine brackets.
˜
Make sure that the TPS cou-
pler does not go outside the
chassis.
ˆ
Fasten the TPS lead to the
frame with a plastic band.
Ø
Fasten the neutral switch lead
and oil hose together with a
plastic locking tie and cut off
the tie end.
∏
Fasten the neutral switch lead
to the frame with a plastic
band.
Œ
Fasten the neutral switch lead,
CDI magneto lead and radiator
breather hose to the frame with
a plastic band.
Â
Fasten the neutral switch lead,
CDI magneto lead and radiator
breather hose to the frame with
a plastic locking tie and cut off
the tie end.
Í
Pass the neutral switch lead,
CDI magneto lead and radiator
breather hose between the
radiator and frame.
Ê
Fasten the neutral switch lead
and CDI magneto lead to the
cable guide at their protecting
tubes with a plastic locking tie
and cut off the tie end.
Ë
Pass the carburetor breather
hoses and overflow hose so
that all there hoses do not con-
tact the rear shock absorber.
B
0
C-C
D-D
B
A
A
B
D
D
C
C
F
D
G
F
D
◊
A
G
A
A
F
A
E
A
D
C
A
A
A
A
B
A
0
1
2
3
4
5
6
7
8
9
‰
Ì
‰
Ï
‰
Î
Ç
ı
Å
Ê
Ó
È
Ô
Ò
A
˜
ˆ
Ø
∏
Œ
Â
Í
Ë
H
I
H
E
Summary of Contents for YZ450F(S)
Page 47: ...GEN INFO MEMO ...
Page 67: ...GEN INFO MEMO ...
Page 193: ...INSP ADJ MEMO ...
Page 581: ... ELEC MEMO ...
Page 613: ...TUN MEMO ...
Page 640: ......
Page 641: ......