
25
3.
GETTING STARTED
3.1.
UNPACKING AND INITIAL SETUP
CAUTION
To avoid personal injury, always use two persons to lift and carry the Model T101.
Remove dust plugs prior to operating instrument. It is recommended that you store shipping
containers/materials, including shipping screws and dust plugs for the pneumatic ports, for future use
if/when the instrument should be returned to the factory for repair and/or calibration service. See
Warranty section in this manual and shipping procedures on our Website at
under Customer Support > Return Authorization.
1.
Inspect the received packages for external shipping damage. If damaged,
please advise the shipper first, then Teledyne ML.
2.
Included with your analyzer is a printed record (Form number 04551) of
the final performance characterization performed on your instrument at
the factory. This record is an important quality assurance and calibration
record for this instrument. It should be placed in the quality records file
for this instrument.
3.
Carefully remove the top cover of the analyzer and check for internal
shipping damage.
•
Remove the set screw located in the top, center of the rear panel
•
Remove the screws fastening the top cover to the unit (four per side).
•
Lift the cover straight up.
CAUTION – Avoid Warranty Invalidation
Printed circuit assemblies (PCAs) are sensitive to electro-static discharges too small
to be felt by the human nervous system. Damage resulting from failure to use ESD
protection when working with electronic assemblies will void the instrument warranty.
See
A Primer on Electro-Static Discharge
in this manual for more information on preventing
ESD damage.
Summary of Contents for T101
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ...ii This page intentionally left blank ...
Page 10: ...vi This page intentionally left blank ...
Page 12: ...viii This page intentionally left blank ...
Page 22: ...TABLE OF CONTENTS Teledyne ML T101 Operation Manual xviii This page intentionally left blank ...
Page 166: ...Remote Operation Teledyne ML T101 Operation Manual 162 This page intentionally left blank ...
Page 248: ......
Page 336: ...This page intentionally left blank B 4 07266B DCN6485 ...
Page 339: ...APPENDIX D Wire List and Electronic Schematics D 1 07266B DCN6485 ...
Page 340: ...This page intentionally left blank 07266B DCN6485 D 2 ...
Page 345: ...D 7 07266B DCN6485 ...