
Principles Of Operation
Teledyne ML - T101 Operation Manual
250
The lamp used in the Model T101 is constructed with a vacuum jacket surrounding a
double-bore lamp element (Figure 10-3). The vacuum jacket isolates the plasma arc
from most external temperature fluctuations. The jacket contains the thermal energy
created by the lamp’s operation, thereby helping the lamp heat up and maintains proper
vaporization temperature. Light is emitted through a 20 mm x 5 mm portal.
Light Output
Portal
Zinc-Vapor
Plasma Arc
Vacuum
Jacket
Dual Bore
Figure 10-3. Source UV Lamp Construction
10.2.2.
THE REFERENCE DETECTOR
A vacuum diode UV detector that converts UV light to a DC current is used to measure
the intensity of the excitation UV source lamp. Its location, directly across from the
source lamp at the back of a narrow tube-shaped light trap, places it directly in the path
of the excitation UV light. A window transparent to UV light provides an air-proof seal
that prevents ambient gas from contaminating the sample chamber. The shape of the
light trap and the fact that the detector is blind to wavelengths other than UV means no
extra optical filtering is needed.
10.2.3.
THE PMT
The amount of fluoresced UV produced in the sample chamber is much less than the
intensity of excitation UV source lamp (see Figure 10-4). Therefore a much more
sensitive device is needed to detect this light with enough resolution to be meaningful.
The Model T101 uses a Photo Multiplier Tube or PMT for this purpose (see 10.4.4 for
more details regarding the electronic operation of the PMT).
Summary of Contents for T101
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ...ii This page intentionally left blank ...
Page 10: ...vi This page intentionally left blank ...
Page 12: ...viii This page intentionally left blank ...
Page 22: ...TABLE OF CONTENTS Teledyne ML T101 Operation Manual xviii This page intentionally left blank ...
Page 166: ...Remote Operation Teledyne ML T101 Operation Manual 162 This page intentionally left blank ...
Page 248: ......
Page 336: ...This page intentionally left blank B 4 07266B DCN6485 ...
Page 339: ...APPENDIX D Wire List and Electronic Schematics D 1 07266B DCN6485 ...
Page 340: ...This page intentionally left blank 07266B DCN6485 D 2 ...
Page 345: ...D 7 07266B DCN6485 ...