
Calibration Procedures
Teledyne ML – T101 Operation Manual
166
STEP ONE: Connect the sources of zero air and span gas as shown below.
No Valve Options Installed
Chassis
Sample
Zero Air
Exhaust
Span
MODEL 701
Zero Air
Generator
Calibrated
H
2
S GAS
(At high
concentration)
Source of
SAMPLE Gas
Removed
during
Calibration
Valve
OR
Needle valve to
control flow
Chassis
Sample
Zero Air
Exhaust
Span
MODEL 701
Zero Air
Generator
VENT
Calibrated
H
2
S GAS
(At span gas
concentration)
Source of
SAMPLE Gas
Removed
during
calibration
MODEL T700 Gas
Dilution
Calibrator
Figure 6-1. Setup for Manual Calibration without Z/S Valve or IZS Option
Summary of Contents for T101
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ...ii This page intentionally left blank ...
Page 10: ...vi This page intentionally left blank ...
Page 12: ...viii This page intentionally left blank ...
Page 22: ...TABLE OF CONTENTS Teledyne ML T101 Operation Manual xviii This page intentionally left blank ...
Page 166: ...Remote Operation Teledyne ML T101 Operation Manual 162 This page intentionally left blank ...
Page 248: ......
Page 336: ...This page intentionally left blank B 4 07266B DCN6485 ...
Page 339: ...APPENDIX D Wire List and Electronic Schematics D 1 07266B DCN6485 ...
Page 340: ...This page intentionally left blank 07266B DCN6485 D 2 ...
Page 345: ...D 7 07266B DCN6485 ...