
4. During the process a progress bar is visible.
5. At the end of the zero adjustment, the outcome is displayed as an offset and a standard
deviation.
Note
If you get an error message after the zero point adjustment, refer to Zero point
Commissioning
6.3 Local commissioning
MASS 2100 & FC300 (FCT030)
98
Operating Instructions, 06/2017, A5E39789040-AA