
)&
①
Open primary valve
②
Open secondary valve
③
Close primary valve
④
Close secondary valve
Example 2: Open primary valve at 0 %; close primary valve after closing secondary valve
configured in recipe 1
Parameter configuration:
Menu 2.5 Dosing
- 2.5.1 Dosing Mode = Two on/off valves
Menu 2.5.5.6 Valve Control
- 2.5.5.6.1 Stage Setup Format = Relative
- 2.5.5.6.2 Stage 1 Primary Open = 0 %
- 2.5.5.6.3 Stage 1 Primary Close = 100 %
- 2.5.5.6.4 Stage 2 Secondary Open = 33 %
- 2.5.5.6.5 Stage 2 Secondary Close = 66 %
)&
①
Open primary valve
②
Open secondary valve
③
Close secondary valve
④
Close primary valve
Example 3: Open secondary valve at 0 %; close primary valve before closing secondary valve
configured in recipe 1
Parameter configuration:
Menu 2.5 Dosing
- 2.5.1 Dosing Mode = Two on/off valves
Menu 2.5.5.6 Valve Control
- 2.5.5.6.1 Stage Setup Format = Relative
- 2.5.5.6.2 Stage 1 Primary Open = 33 %
- 2.5.5.6.3 Stage 1 Primary Close = 66 %
- 2.5.5.6.4 Stage 2 Secondary Open = 0 %
- 2.5.5.6.5 Stage 2 Secondary Close = 100 %
Functions
8.8 Dosing
MASS 2100 & FC300 (FCT030)
160
Operating Instructions, 06/2017, A5E39789040-AA