![background image](http://html1.mh-extra.com/html/omron/cx-supervisor/cx-supervisor_user-manual_744211083.webp)
Device Configuration
SECTION 6 Projects
82
On completion, click the
OK
button to continue, or the
Cancel
button to abort
the operation. Values specified may be set as default by clicking the
Make
Default
button.
A network may be specified for the selected PLC, by selecting from the
Network: field. The networks available are dependent on the device type
selected.
To open the Network Settings dialog box, click the
Setup
button:
The Unit Number is the identifier for the network being configured.
The
Destination Network Address
and
Destination Node Number
identify
the connection point to the network.
A PLC can be selected to act as a gateway to the PLC being edited; this list is
restricted to the PLCs contained in the current project.
Selecting the
Driver
tab results in the Driver Configuration view being
displayed; this part of the Network Settings dialog box helps to ensure that
data is transmitted correctly over the network.
Note:
The possible settings for PLC configuration depend upon the type of PLC
selected (this applies also to the Read Only and Timer/Clock fields).
Summary of Contents for CX-Supervisor
Page 1: ...CX Supervisor Software Cat No W10E EN 01 User Manual Software Release 3 1...
Page 3: ...Copyright Notice 2...
Page 16: ...15...
Page 17: ...16...
Page 27: ...Tip of the Day SECTION 1 Graphics Editor 26...
Page 35: ...CX Supervisor Preferences SECTION 2 Pages 34...
Page 79: ...Responding to Events SECTION 5 ActiveX Objects 78...
Page 115: ...Printing the Graphics Library SECTION 7 Graphics Library 114...
Page 181: ...Data Logging SECTION 11 Data Logging 180...
Page 201: ...Examples SECTION 12 Databases 200...
Page 243: ...Performance Monitor SECTION 16 Application Analysis Performance Monitor 242...
Page 253: ...Using with Omron s CX Server OPC SECTION 17 Using CX Supervisor as an OPC Cli 252...
Page 259: ...Creating a CX Supervisor Client application SECTION 18 Connecting to a remote CX 258...
Page 263: ...Adding a Point Linked to a Parameter SECTION 19 Connecting to Omron Industrial 262...
Page 271: ...Data Logging SECTION 20 Best Practices 270...
Page 275: ...Configuring a Server PC running Windows NT or 2000 Appendix A Configuring a PC 274...
Page 277: ...Appendix B Frequently Asked Questions 276...
Page 296: ...Appendix B Frequently Asked Questions 295...
Page 297: ...Appendix B Frequently Asked Questions 296...
Page 298: ...Appendix B Frequently Asked Questions 297...
Page 299: ...Appendix B Frequently Asked Questions 298...
Page 333: ...Revision history 332...