![background image](http://html1.mh-extra.com/html/omron/cx-supervisor/cx-supervisor_user-manual_744211208.webp)
Creating / Running a CFR Application (Microsoft Access)
SECTION 13 CFR (Title 21
207
13-4-9 Audit Trail Configuration Settings – Alarms Errors and Events
It is not necessary to invoke the Audit Trail Configuration dialog for auditing
points, but to generate an audit trail for alarms, errors and events the default
configuration state must be modified.
Launch the Audit Trail Configuration dialog.
Check the Log Alarm checkbox to allow logging of Alarms.
N.B. Logging of Alarms can be set to log ‘All Alarms’ or ‘Selected Alarms’. The
attribute to select any individual alarm is applied in the Alarms settings dialog
as described in the section below. ‘All Alarms’ when selected, overrides the
setting applied to individual alarms. ‘Selected Alarms’ setting will log to Audit
Trail only those Alarms with the ‘Generate Audit Trail’ attribute applied in the
Alarm Settings dialog.
Check the Log Errors/Events checkbox as shown below to allow Error and
Events to be logged into the Audit Trail.
Press OK to save these settings.
13-4-10 Configuring Alarms for Audit Trail Records
To demonstrate logging Alarms to the Audit Trail the CFR Test Project can be
modified as follows.
Summary of Contents for CX-Supervisor
Page 1: ...CX Supervisor Software Cat No W10E EN 01 User Manual Software Release 3 1...
Page 3: ...Copyright Notice 2...
Page 16: ...15...
Page 17: ...16...
Page 27: ...Tip of the Day SECTION 1 Graphics Editor 26...
Page 35: ...CX Supervisor Preferences SECTION 2 Pages 34...
Page 79: ...Responding to Events SECTION 5 ActiveX Objects 78...
Page 115: ...Printing the Graphics Library SECTION 7 Graphics Library 114...
Page 181: ...Data Logging SECTION 11 Data Logging 180...
Page 201: ...Examples SECTION 12 Databases 200...
Page 243: ...Performance Monitor SECTION 16 Application Analysis Performance Monitor 242...
Page 253: ...Using with Omron s CX Server OPC SECTION 17 Using CX Supervisor as an OPC Cli 252...
Page 259: ...Creating a CX Supervisor Client application SECTION 18 Connecting to a remote CX 258...
Page 263: ...Adding a Point Linked to a Parameter SECTION 19 Connecting to Omron Industrial 262...
Page 271: ...Data Logging SECTION 20 Best Practices 270...
Page 275: ...Configuring a Server PC running Windows NT or 2000 Appendix A Configuring a PC 274...
Page 277: ...Appendix B Frequently Asked Questions 276...
Page 296: ...Appendix B Frequently Asked Questions 295...
Page 297: ...Appendix B Frequently Asked Questions 296...
Page 298: ...Appendix B Frequently Asked Questions 297...
Page 299: ...Appendix B Frequently Asked Questions 298...
Page 333: ...Revision history 332...