![background image](http://html1.mh-extra.com/html/omron/cx-simulator-1-9/cx-simulator-1-9_operation-manual_744207145.webp)
Debugging Operation
Section 4-2
106
4-2-5 Pause ( )
Pause pauses executing the ladder diagram.
The situation is also the same when the execution of the ladder program is
stopping in Scan Run, Step Run, a break point, or an I/O break condition.
While pausing, the peripheral servicing is performed.
4-2-6 Other Operation
Scan Replay ( )
The Scan Replay returns the execution status to the first of the scan when
pausing.
The Scan Replay returns all of the status including values changed by the
program execution to that of the scan start.
As long as it is within a scan, monitoring can be done with conditions changed
any times.
Reset ( )
The Reset simulates the process in the Ladder Engine when from power in-
terruption to power on. The power interruption task is started at power inter-
ruption to allow debugging the power interruption process (only when regis-
tered).
Returning from the Reset turns the mode to Program.
Summary of Contents for CX-Simulator 1.9
Page 1: ...Cat No W366 E1 10 CX Simulator Ver 1 9 SYSMAC WS02 SIMC1 E OPERATION MANUAL...
Page 2: ......
Page 3: ...SYSMAC WS02 SIMC1 E CX Simulator Ver 1 9 Operation Manual Revised December 2009...
Page 24: ...xxv...
Page 30: ...xxxi...
Page 35: ...xxxvi...
Page 39: ......
Page 63: ...Comparison of the CX Simulator and SYSMAC CS CJ series PLCs Section 1 6 24...
Page 75: ...Installing and Uninstalling the Software Section 2 1 36...
Page 157: ...Task Debugging Section 4 4 118...
Page 195: ...Connection with Application Programs Section 7 2 156...
Page 225: ...Checking the Result Section 8 5 186...
Page 277: ...Other Functions Section 9 4 238...
Page 289: ...Other Tips for Troubleshooting Section 10 3 250...
Page 304: ......
Page 305: ......