![background image](http://html1.mh-extra.com/html/omron/cx-simulator-1-9/cx-simulator-1-9_operation-manual_744207223.webp)
Checking the Result
Section 8-5
184
8-5 Checking the Result
8-5-1 Checking by Time Chart Monitor of the CX-Programmer
The results from virtual external inputs can be checked by the time chart
monitor or the data trace of the CX-Programmer. Displaying the data of virtual
external inputs and its results simultaneously allows to confirm the operation
results and timing of the ladder program.
Note
Refer to the
Data Trace/Time Chart Monitoring
of
CHAPTER 4 - Reference
of
PART 1: CX-Programmer
in the
CX-Programmer Operation Manual
(W446)
for how to operate the data trace and time chart monitoring.
Summary of Contents for CX-Simulator 1.9
Page 1: ...Cat No W366 E1 10 CX Simulator Ver 1 9 SYSMAC WS02 SIMC1 E OPERATION MANUAL...
Page 2: ......
Page 3: ...SYSMAC WS02 SIMC1 E CX Simulator Ver 1 9 Operation Manual Revised December 2009...
Page 24: ...xxv...
Page 30: ...xxxi...
Page 35: ...xxxvi...
Page 39: ......
Page 63: ...Comparison of the CX Simulator and SYSMAC CS CJ series PLCs Section 1 6 24...
Page 75: ...Installing and Uninstalling the Software Section 2 1 36...
Page 157: ...Task Debugging Section 4 4 118...
Page 195: ...Connection with Application Programs Section 7 2 156...
Page 225: ...Checking the Result Section 8 5 186...
Page 277: ...Other Functions Section 9 4 238...
Page 289: ...Other Tips for Troubleshooting Section 10 3 250...
Page 304: ......
Page 305: ......