3.6 Initial settings
3
-
91
FRA 51602
Table 3-1
Initial settings 8/8
Setting item
Parameter range
Initial value
R
es
et
LA
N
R
E
SE
T
R
es
um
e
Save as
m
eas
ur
em
ent
dat
a
< Calibration >
EQUALIZE
ON | OFF
OFF
Y
Y
Y
N
< Other >
BEEP
ON | OFF
ON
Y
Y
N
N
DATE/TIME
YEAR
1998 to 2099
(when shipped)
N
Y
Y
N
MONTH
1 to 12
(when shipped)
N
Y
Y
N
DATE
1 to 31
(when shipped)
N
Y
Y
N
TIME
0 to 23
(when shipped)
N
Y
Y
N
MINUTE
0 to 59
(when shipped)
N
Y
Y
N
SEC
0 to 59
(when shipped)
N
Y
Y
N
TOUCH ADJUST
–
–
N
Y
N
N
BRIGHTNESS
0 to 100
50
N
Y
N
N
■ Remarks
Y
There is the function
N
There is no function (no influence)
–
Not applicable
Summary of Contents for FRA51602
Page 1: ...NF Corporation GAIN PHASE ANALYZER FRA51602 INSTRUCTION MANUAL OPERATIONS...
Page 2: ......
Page 3: ...GAIN PHASE ANALYZER FRA51602 INSTRUCTION MANUAL OPERATIONS DA00061635 001...
Page 24: ...1 3 Operating principles 1 10 FRA51602 Blank...
Page 31: ...2 2 Installation 2 7 FRA51602 Figure 2 1 Rack mounting kit assembly diagram JIS...
Page 32: ...2 2 Installation 2 8 FRA51602 Figure 2 2 Rack mounting kit assembly diagram EIA...
Page 33: ...2 2 Installation 2 9 FRA51602 Figure 2 3 Rack mounting kit dimensions JIS...
Page 34: ...2 2 Installation 2 10 FRA51602 Figure 2 4 Rack mounting kit dimensions EIA...
Page 130: ...3 6 Initial settings 3 92 FRA51602 Blank...
Page 264: ...9 9 Miscellaneous specifications 9 18 FRA51602 Figure 9 3 External dimensions...
Page 280: ...XVI FRA51602 Blank...
Page 282: ......
Page 284: ......
Page 285: ......
Page 286: ...http www nfcorp co jp NF Corporation 6 3 20 TsunashimaHigashi Kohoku ku Yokohama223 8508JAPAN...