![Manitowoc 140.5.204 Operation Manual Download Page 617](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123617.webp)
2.
Tilt and hold upward the
[Extend/retract rear left outrigger cylinder]
lever on the Setup
remote radio control until the outrigger cylinder has reached
fastening position P1.
1
Bolt in fastening position P1
3.
Mount and secure the bolt in fastening position P1.
4.
Tilt and hold downward the
[Extend/retract rear left outrigger cylinder]
lever until the out-
rigger cylinder is fully retracted.
5.
Repeat these steps to change the fastening position of the
remaining outrigger cylinders from P2 to P1.
1
Adapter
2
Outrigger pad
Remove the adapter from the outrigger pad.
Removing the adapter
Transport
27.04.2020
140.5.204 Telescopic crane
617
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...