![Manitowoc 140.5.204 Operation Manual Download Page 385](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123385.webp)
n
Machine operator
n
Slinger
n
Auxiliary crane
n
Ladder
n
Lifting equipment
Requirement:
n
Uppercarriage is at 0°.
n
The boom is fully retracted.
n
The boom is lowered to 0°.
n
The hoisting rope is unreeved.
n
The deflection sheave is mounted on the boom.
n
The
Setup attachment
setup mode is set on the SENCON.
n
The diagonal tie of the heavy-duty jib is in the working position.
n
The bolts at the connection points to the boom have been
removed.
1.
Attach suitable hoisting gear to the heavy-duty jib at the lifting
point to an auxiliary crane.
2.
Using the auxiliary crane, lift the heavy-duty jib to the boom's
pulley head.
Personnel
Tools
Start-up and setup
27.04.2020
140.5.204 Telescopic crane
385
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...