3.
Using a rope, pull the heavy-duty jib around until it reaches
the boom's bolting point.
4.
Mount and secure the bolts between the heavy-duty jib and
the boom on the left-hand side.
5.
Push the lever of the bearing block on the boom upward.
ð
The bolts at the pivot point are removed.
Start-up and setup
27.04.2020
140.5.204 Telescopic crane
397
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...