![Manitowoc 140.5.204 Operation Manual Download Page 500](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123500.webp)
n
The load and its center of gravity are known.
n
The load is suspended vertically.
–
The upper attachment point on the load is fastened to the
rope of the attachment.
The rope of the attachment carries the entire weight of the
load.
–
The lower attachment point on the load is fastened to the
rope of the boom.
The rope of the boom is not bearing any weight.
n
The rope of the boom must be lightly tensioned so that the
rope does not drag.
Observe the set allocation of the winches to the joysticks.
1.
Tilt the joystick in the
[Raise winch 2]
direction until the load
is at the horizontal position.
2.
Tilt the joysticks simultaneously in the
[Lower winch 1]
and
[Lower winch 2]
direction.
ð
The load is lowered.
The load is horizontal during the entire lowering process.
7.15.4.4.3
Moving the load vertically with two winches
Requirement:
n
The extension mode is set for the application at hand.
n
The operation parameters for Tilt-Up Panel Lifting have been
set on the SENCON.
n
The status indicator of the
[Tilt-Up Panel Lifting]
quick-select
icon lights up yellow.
Operation
27.04.2020
140.5.204 Telescopic crane
500
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...