![Manitowoc 140.5.204 Operation Manual Download Page 557](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123557.webp)
2.
Remove the extension cable from the 400 V power socket.
[LML bypass]
push button pressed
and
[LML bypass]
key switch held in
[I]
position
[LML bypass]
push button not pressed
and/or
[LML bypass]
key switch released
The LML is bypassed.
The speed of crane control functions is
not limited.
The load moment limitation is activated.
Pull switch
Press switch
The machine is ready for operation.
The engine and all machine movements
are stopped.
Switch position left
Switch position right
It is not possible to use the hydraulic
power unit.
The hydraulic power unit has been
released for use.
7.20.2.4
Setting up the machine via emergency control
The emergency control function can be used to complete the fol-
lowing tasks if the Setup remote radio control is out of order.
n
Bolt/unbolt the counterweight
n
Extend/retract the ballasting cylinder
LML bypass key switch and push
button
Emergency stop
Release hydraulic power unit
(option)
Operation
27.04.2020
140.5.204 Telescopic crane
557
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...