![Manitowoc 140.5.204 Operation Manual Download Page 388](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123388.webp)
1.
Attach suitable hoisting gear to the heavy-duty jib at the lifting
point to an auxiliary crane.
2.
Use the auxiliary crane to lift the diagonal tie until the bolt can
be removed.
3.
Remove the bolt.
With the auxiliary crane
Start-up and setup
27.04.2020
140.5.204 Telescopic crane
388
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...