3.
Align the heavy-duty jib with the boom's pulley head.
The holes of the heavy-duty jib must line up with those of the
boom.
4.
Mount and secure the bolts between the heavy-duty jib and
the boom on both sides.
ð
The heavy-duty jib is mounted onto the boom.
1.
Remove the lifting equipment.
2.
Move the auxiliary crane out of the work area.
Removing the lifting equipment
Start-up and setup
27.04.2020
140.5.204 Telescopic crane
386
Fo
r
Reference
Only
Summary of Contents for 140.5.204
Page 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Page 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Page 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Page 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...