Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide
371
A
Safety Information
WARNING!
Read the following safety information thoroughly before installing Extreme Networks products. Failure to follow this
safety information can lead to personal injury or damage to the equipment.
Only trained service personnel should perform service to Extreme Networks switches and their
components. Trained service personnel have read all related installation manuals, have the technical
training and experience necessary to be aware of the hazards to which they are exposed in performing a
task, and are aware of measures to minimize the danger to themselves or other persons.
Considerations Before Installing
WARNING!
Consider the following items before installing equipment.
Be sure that the following conditions are met:
●
The system is designed to operate in a typical Telco environmental controlled environment. Choose a
site that has the following characteristics:
●
Temperature and humidity controlled indoor area where maximum ambient room temperature
shall not exceed 40ºC (104ºF)
●
Clean and free from airborne materials that can conduct electricity.
●
Well-ventilated and away from sources of heat including direct sunlight.
●
Away from sources of vibration or physical shock.
●
Isolated from strong electromagnetic fields produced by electrical devices.
●
Secured, enclosed, and restricted access, ensuring that only trained and qualified service
personnel have access to the equipment.
●
In regions that are susceptible to electrical storms, we recommend that you plug your system into a
surge suppressor.
●
Install equipment into the lower half of the rack first to avoid making the rack top heavy.
●
Establish at least 3 inches clearance on all sides for effective ventilation. Do not obstruct the air
intake vent on the front, side, or rear ventilation grills. Locate the system away from heat sources.
●
Make sure that your equipment is placed in an area that accommodates the power consumption and
component heat dissipation specifications.
●
Make sure that your power supplies meet the site power or AC power requirements of the all
network equipment.
Summary of Contents for BlackDiamond 10808
Page 14: ...Table of Contents Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide 14 ...
Page 18: ...Preface Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide 18 ...
Page 19: ...1 Site Preparation ...
Page 20: ......
Page 40: ...Site Preparation Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide 40 ...
Page 41: ...2 BlackDiamond Switches ...
Page 42: ......
Page 93: ...3 Installing BlackDiamond Switches and Modules ...
Page 94: ......
Page 189: ...4 Installing BlackDiamond Switch Accessories ...
Page 190: ......
Page 207: ...5 BlackDiamond Maintenance Procedures ...
Page 208: ......
Page 239: ...6 Summit Family of Switches ...
Page 240: ......
Page 335: ...7 Optics ...
Page 336: ......
Page 363: ...8 Initial Management Access ...
Page 364: ......
Page 369: ...9 Appendixes ...
Page 370: ......