Repacking a BlackDiamond Chassis
Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide
234
Repacking the BlackDiamond 12802 Chassis
To repack the BlackDiamond 12802 chassis for return to Extreme Networks:
1
Prepare the shipping box. Remove saved packing materials except the lower foam cushion, which
should be in the bottom of the box.
2
Remove all modules and power supplies from the chassis. Follow correct Extreme Networks
procedures for removing components from the BlackDiamond chassis.
3
Remove the chassis from the equipment rack as follows:
a
Loosen and remove the eight mounting screws holding the chassis to the rack.
b
Guide the chassis out of the rack and set it on a secure, flat surface.
4
Remove the rack-mounting brackets.
5
Place the chassis into the shipping bag.
6
Carefully set the chassis onto the foam cushion in the bottom of the shipping carton (see
Figure 160
.)
Figure 160: Packing the BlackDiamond 12802 chassis for shipping
7
Set the top foam cushion in place over the chassis (see
Figure 160
).
8
Close the top flaps and seal them securely with packing tape.
BlackDiamond
12802 switch
BD_150
Summary of Contents for BlackDiamond 10808
Page 14: ...Table of Contents Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide 14 ...
Page 18: ...Preface Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide 18 ...
Page 19: ...1 Site Preparation ...
Page 20: ......
Page 40: ...Site Preparation Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide 40 ...
Page 41: ...2 BlackDiamond Switches ...
Page 42: ......
Page 93: ...3 Installing BlackDiamond Switches and Modules ...
Page 94: ......
Page 189: ...4 Installing BlackDiamond Switch Accessories ...
Page 190: ......
Page 207: ...5 BlackDiamond Maintenance Procedures ...
Page 208: ......
Page 239: ...6 Summit Family of Switches ...
Page 240: ......
Page 335: ...7 Optics ...
Page 336: ......
Page 363: ...8 Initial Management Access ...
Page 364: ......
Page 369: ...9 Appendixes ...
Page 370: ......