Reactor L804
b
Reactor L803
4
Remove the main PCB, see
132]. The reactor
measuring points are ONLY reachable on the back side of the main PCB.
5
Measure the resistance of the reactor using a low ohm multi meter.
Result:
The resistance MUST be as follows:
Measuring points
Resistance
c
24.5~45.5 mΩ
d
60.2~111.8 mΩ
c
b
d
c
d
a
c d d
c
a
L804
b
L803
c
Measuring point
d
Measuring point
Is the resistance measurement correct? Action
Yes
Proceed with the next step.
No
Replace the reactor, see
6
Measure the inductance of the reactor using an LCR meter.
Result:
The inductance MUST be as follows:
Measuring points
Resistance
c
81~99 µH