4
|
Components
Service manual
147
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
To remove the switch box
INFORMATION
This procedure is just an example and may differ on some details for your actual unit.
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Remove the insulation on the upper side of the switch box.
a
b
a
Insulation
b
Main PCB
2
Disconnect all connectors from the main PCB.
3
Disconnect the electrical power supply wiring from the wire terminals.
Summary of Contents for RXTA30B2V1B
Page 262: ......
Page 263: ......
Page 264: ...ESIE21 12A 2022 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...