4
|
Components
Service manual
151
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
a
b
a
Cable tie
b
Switch box
7
Install the insulation on the upper side of the switch box.
a
b
a
Insulation
b
Main PCB
4.17.2 Indoor unit
To open the front panel
FTXTA-B units
1
Hold the front panel on both sides and open it.
Open the front panel using the user interface.
2
Stop operation.
Summary of Contents for RXTA30B2V1B
Page 262: ......
Page 263: ......
Page 264: ...ESIE21 12A 2022 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...