4
|
Components
Service manual
163
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
5
Connect the grounding wire to the heat exchanger using the screw.
6
Install the grounding wire cover using the screw.
7
Connect the power supply wiring to the power supply terminal X1M.
FTXTM-R units
1
install the switch box in the correct location on the indoor unit.
c
f
b
a
d
A
e
A
FTXTM30R units
a
Power supply terminal X1M
b
Power supply wiring bracket
c
Screw (ground wire)
d
Indoor unit main PCB
e
Switch box screw
f
Switch box
c
f
b
a
d
A
e
A
FTXTM40R units
a
Power supply terminal X1M
b
Power supply wiring bracket
c
Screw (ground wire)
d
Indoor unit main PCB
e
Switch box screw
f
Switch box
Summary of Contents for RXTA30B2V1B
Page 262: ......
Page 263: ......
Page 264: ...ESIE21 12A 2022 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...