4
|
Components
Service manual
55
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
a
b
a
c
a
4‑way valve pipe
b
4‑way valve
c
Putty
5
Stop the nitrogen supply when the piping has cooled down.
6
Remove the 4‑way valve.
INFORMATION
It is ALSO possible to cut the component pipe(s) using a pipe cutter. Make sure to
remove the remaining component pipe end(s) from the refrigerant pipes by heating
the brazing point(s) of the component pipe(s) using an oxygen acetylene torch.
7
Install plugs or caps on the open pipe ends of the refrigerant piping to avoid
dirt or impurities from entering the piping.
8
To install the 4‑way valve body, see
To install the 4-way valve body
1
Remove the plugs or caps from the refrigerant piping and make sure they are
clean.
2
Remove the 4‑way valve coil from the spare part 4‑way valve body.
3
Install the 4‑way valve body in the correct location and correctly oriented.
Insert the pipe ends in the pipe expansions.
4
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
5
Wrap a wet rag around the 4‑way valve body and any other components near
the 4‑way valve and solder the 4‑way valve pipes to the refrigerant pipes.
Summary of Contents for RXTA30B2V1B
Page 262: ......
Page 263: ......
Page 264: ...ESIE21 12A 2022 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...